24/04/2020

  1. Discussed various options available batching.
    1. Discussed options like state v/s RPC.
    2.  Renato has agreed to come up with state model batching initial cut and we can discussed based on results found.
  2. Libyang 1.0 is ready and FRR should be using libyang 1.0 in coming weeks.
    1. Renato is working with David to get the patch ready.
    2. All the yang model where leafref was moved to string needs to be changed back leafref.
    3. Leafref issue with libyang 1.0 has been raised. https://github.com/CESNET/libyang/issues/1070
  3. Change in libyang signature is ready.
    1. https://github.com/FRRouting/frr/pull/6279
    2. All the nb callbacks should be rebased to this new signature.
  4. backend encrypt of password is ready. Soon a PR will be raised.
    1. https://github.com/LabNConsulting/frr/tree/ziemba/encrypt-proto-keys-v3

Public Last updated: 2020-05-08 03:03:59 PM